Labor
The Labor tab allows you to set guidelines for labor allowances. Labor allowances are in hours or labor units. Items that are not applicable should be left blank. Items that not be included in an estimate (such as items that are not covered) should be set to “0” (zero).
The Manage Profiles window appears.
|
Reference
Labor Allowances |
||
Clear Coat |
Enter the guideline amount for Clear Coat. |
|
Color Sand/Buff |
Enter the guideline amount for Color Sand/Buff. |
|
Frame Setup |
Enter the guideline amount for Frame Setup. |
|
|
@ Body Select this check box if the amount charged on the estimate for Frame Setup is the Body Labor rate. |
|
Any Repair Line |
Enter the guideline amount for Any Repair Line. |
|
Blend |
Enter the guideline amount for Blend. |
|
Tint |
Enter the guideline amount for Tint. |
|
|
@ Body Select this check box if the amount charged on the estimate for Tint is the Body Labor rate. |
|
Frame Repair |
Enter the guideline amount for Frame Repair. |
|
Bumper Repair vs. Replace Alerts |
||
If Primary POI is Front or Rear |
Enter the guideline amount for If Primary POI is Front or Rear. |
|
Enter the guideline amount for If Primary POI is not Front or Rear. |